Mini central Hidroeléctricas del Rio Viejo.

ENEL.;

Standardization of Michell - Banki Turbines. Phase 2.

Consulting Engineers, Architects and Economist.;

Proyecto Rio Viejo - Master Plan. Executive Summary - Final Report.

Norconsult International Norway.; Swedpower AB Sweden;

Master Plan Prefeasibility Study of Lower Rio Viejo: Final Report.

Norconsult International Norway.; Swedpower AB Sweden;

Proyecto Rio Viejo - Master Plan. Hydrological Study: Draft Final Report.

Norconsult International Norway; Swedpower AB Sweden;

Proyecto Rio Viejo - Master Plan. Hydrological Study: Draft Final Report.

Norconsult International Norway; Swedpower AB Sweden;

Proyecto Rio Viejo-Master Plan. Final main Report Volumen 1B-Appendices-Drawings.

Norconsult International Norway.; Swedpower AB Sweden;

Studies of Projects Included in the Programme for Development of Small Hydroelectric Power Plants. Rio Viejo Lower Reach Seismic Refraction Investigation.

Consulting Engineers, Architects and Economist.;

Informe Prefactibilidad del Tramo Inferior del Rio Viejo.

Instituto Nicaragüense de Energía. Dirección General de Planificación ;

Studies of Projects Included in the Programme for Development of Small Hydroelectric Power Plants, Rio Viejo Lower Reach Seismic Refraction Investigation

Consulting Engineers, Architects and Economist;

Standardization of Michell-Banki Turbines Phase 2

Consulting Engineers. Architects and Economic.;

Proyecto Río Viejo-Master Plan, Hydrological Study - Draft Final Repor

Norconsult International Norway; Swedpower AB Sweden;

Lower Rio Viejo-Prefeasibility Study. Interim Repor

Norconsult International Norway; Swedpower AB Sweden;

Proyecto Rio Viejo-Master Plan. Executive Summary-Final Report

Norconsult International Norway; Swedpower AB Sweden;

Proyecto Rio Viejo-Mater Plan. Hydrological Study - Draft Final Report

Swedpower AB Sweden; Norconsult International Norway;

Proyecto Rio Viejo-Master Plan. Hydrological Study - Draft Final Report

Norconsult International Norway; Swedpower AB Sweden;

Master Plan Prefeability Study of Lower Rio Viejo - Final Report

Swedpower AB Sweden; Norconsult International Norway;

Proyecto Río Viejo-Mater Plan. Final main Report: Volumen 18-Appendices Drawings

Norcuonsult International Norway; Swedpower AB Sweden;

Mostrando:
Energizing finance understanding the land scapeVer Ficha
Nationally determinated contributions under de Paris Agreement.Ver Ficha
Nuclear energy for a net zero worldVer Ficha
World energy outlook 2021Ver Ficha
Nationally determined contributions across the Americas. A comparative hemispheric analysis.Ver Ficha
Código de Instalaciones Eléctricas de NicaraguaVer Ficha
Economía ambiental : una introducción.Ver Ficha
Apuntes para un manual técnico de diseño, estandarización y fabricación de equipos para pequeñas centrales hidroeléctricas. Turbinas Michell - BankiVer Ficha
Informe de estadísticas energéticas = Energy statistics report 2012Ver Ficha
Manual estadística energética 2017 = Energy statistics manual 2017Ver Ficha


Dirección: Av. Mariscal Antonio José de Sucre N58-63 y Fernández Salvador Edif. Olade - San Carlos, Quito - Ecuador.

Web: www.olade.org

Teléfonos: (593 2) 259 8122 / 2598 280

Correo: realc@olade.org

ADMIN
Desarrollado por: Aikyu-Systems