Standardization of Michell - Banki Turbines. Phase 2. |
Proyecto Rio Viejo - Master Plan. Executive Summary - Final Report. |
Master Plan Prefeasibility Study of Lower Rio Viejo: Final Report. |
Proyecto Rio Viejo - Master Plan. Hydrological Study: Draft Final Report. |
Proyecto Rio Viejo - Master Plan. Hydrological Study: Draft Final Report. |
Proyecto Rio Viejo-Master Plan. Final main Report Volumen 1B-Appendices-Drawings. |
Studies of Projects Included in the Programme for Development of Small Hydroelectric Power Plants. Rio Viejo Lower Reach Seismic Refraction Investigation. |
Informe Prefactibilidad del Tramo Inferior del Rio Viejo. Instituto Nicaragüense de Energía. Dirección General de Planificación ; |
Studies of Projects Included in the Programme for Development of Small Hydroelectric Power Plants, Rio Viejo Lower Reach Seismic Refraction Investigation |
Proyecto Río Viejo-Master Plan, Hydrological Study - Draft Final Repor |
Lower Rio Viejo-Prefeasibility Study. Interim Repor |
Proyecto Rio Viejo-Master Plan. Executive Summary-Final Report |
Proyecto Rio Viejo-Mater Plan. Hydrological Study - Draft Final Report |
Proyecto Rio Viejo-Master Plan. Hydrological Study - Draft Final Report |
Master Plan Prefeability Study of Lower Rio Viejo - Final Report |
Proyecto Río Viejo-Mater Plan. Final main Report: Volumen 18-Appendices Drawings |