Studies of Projects Included in the Programme for Development of Small Hydroelectric Power Plant - Part 5. Rio Viejo Scheme Feasibility Study.
Septiembre 1985
13.2-9 Reg.0374
Summary; Introduction; Topography; Hydrology; Sediment Transports; Ground Investigations; Seismology; General Layout; Construction Procedure; Cost Estimate; Energy Production; Economical Analysis; Geological Maps.