Mojolka Hydroelectric Project. Phase I - Review of Prefeasibility Report.
Noviembre 1982
11.5-2 Reg.0074
Site Selection; Hydrology; Geotechnical Aspects; Environmental Aspects; Layout Studies at The Boboke Site;Transmission System Studies; Cost Estimates and Scheduling;Power Potential and Optimization; Load Forecast; Economic and Financial Aspects.
Ministerio de Energía y Minas - Centro de Documentación
Marjorie Montiel
Hospital Bautista, 1 C. Este, 1 Cuadra al Norte. Managua
2280-9500 al 09
De Lunes a Viernes de las 8:00am - 5:00pm.