« Volver Ficha del Documento

Proceedings of the 7th New Zealand Geothermal Workshop 1985. Response of the production and reinjection wells during the initial exploitation of the Tongonan geothermal field, Philippines. New Zealand Geothermal Workshop [7, 6-8 Nov. 1985, New Zealand].

1985

1067
CIENA

0-86869-065-1

Field monitoring and testing have been undertaken in the Tongonan Geothermal field since the commissioning of the first 112.5 Mw last March 1983. Well performance and early exploitation data show the changing phases of the geothermal fluid caused by exploitation. An increasing enthalpy and chloride brine in production wells is a general feature in the field. Apparently, because of the two phase condition the pressure drawndown is only localized and has not been significantly observed at the center of the field. Indications of slight reinjection returns are noticeable but is not a major feature in the production wells. This paper will discuss the initial exploitation response of the wells which are drilled through a section of two phase and single phase liquid dominated reservoir of Tongonan. ABSTRACT. INTRODUCTION. RESERVOIR DESCRIPTION. FIELD MANAGEMET STRATEGY. Well output changes. Temperature and pressure changes. Chemical changes. Changes in reinjection well capacities.

Presenta gráfs.

Ministerio de Ambiente y Energía. Secretaría de Planificación del Sub-Sector Energía - Centro de Información de Energía y Ambiente, CIENA

Grettel Ruiz Matarrita

Calle 25, Avenidas 8 y 10. San José, Costa Rica

(506)25476900 - 25476239

De lunes a viernes de 8 a.m. a 12m.


Dirección: Av. Mariscal Antonio José de Sucre N58-63 y Fernández Salvador Edif. Olade - San Carlos, Quito - Ecuador.

Web: www.olade.org

Teléfonos: (593 2) 259 8122 / 2598 280

Correo: realc@olade.org

ADMIN
Desarrollado por: Aikyu-Systems