Efficient allocation of steam. Industrial Energy-Conservation.
1982
835
CIENA
0-262-03085-3
GENERATING STEAM. Factors in steam cost. Major variables in steam cost. DISTRIBUTING STEAM. Turbogenerators. Turbine-driven pumps. Turbine-driven fans. Pressure-reducing-valve stations. RECOVERING CONDENSATE. Monitoring quality. Cost savings. Deaerators. BOILER FEEDWATER. CONCLUDING NOTES.
Presenta ilus.
Ministerio de Ambiente y Energía. Secretaría de Planificación del Sub-Sector Energía - Centro de Información de Energía y Ambiente, CIENA
Grettel Ruiz Matarrita
Calle 25, Avenidas 8 y 10. San José, Costa Rica
(506)25476900 - 25476239
De lunes a viernes de 8 a.m. a 12m.