« Volver Ficha del Documento

The Itaipu hydroelectric project 12600 MW design and construction features

1981

I881i
621.312

Itaipu project and its execution. Project feasibility studies. Project Layout. Geology, geothechnical investigations and foundation treatment. Construction plannig, plant and schedule. River diversion and cofferdams. Diversion control structure and closure equipment. Earthfill and rockfill dams. Hollow gravity and buttress dams. Powerhouse arrangement and design. Principal powerplant equipment. Power intakes : equipment and penstocks. Spillway; hydrology, basic design and hydraulic model tests. Geomechanica and structural model tests. Instrumentation for evaluation of performance of Itaipu structures.

Organización Latinoamericana de Energía (OLADE) - Centro de Documentación

Blanca Guanocunga

Av. Mariscal Antonio José del Sucre N58-63 y Fernández Salvador. Quito, Ecuador

(593 2) 25 98 122

Lunes a jueves de: 09h00 a 16h00
Viernes de: 09h00 a 13h00


Dirección: Av. Mariscal Antonio José de Sucre N58-63 y Fernández Salvador Edif. Olade - San Carlos, Quito - Ecuador.

Web: www.olade.org

Teléfonos: (593 2) 259 8122 / 2598 280

Correo: realc@olade.org

ADMIN
Desarrollado por: Aikyu-Systems