The Itaipu hydroelectric project 12600 MW design and construction features
1981
I881i
621.312
Itaipu project and its execution. Project feasibility studies. Project Layout. Geology, geothechnical investigations and foundation treatment. Construction plannig, plant and schedule. River diversion and cofferdams. Diversion control structure and closure equipment. Earthfill and rockfill dams. Hollow gravity and buttress dams. Powerhouse arrangement and design. Principal powerplant equipment. Power intakes : equipment and penstocks. Spillway; hydrology, basic design and hydraulic model tests. Geomechanica and structural model tests. Instrumentation for evaluation of performance of Itaipu structures.
Organización Latinoamericana de Energía (OLADE) - Centro de Documentación
Blanca Guanocunga
Av. Mariscal Antonio José del Sucre N58-63 y Fernández Salvador. Quito, Ecuador
(593 2) 25 98 122
Lunes a jueves de: 09h00 a 16h00
Viernes de: 09h00 a 13h00