Desarrollo de la estructura necesaria para la implementación de un modelo de toma de decisiones para mantenimiento basado en el deterioro multiestado para el parque eólico Los Santos.
2016
COOPESANTOS R.L
Proyecto de Graduación (Licenciatura en Ingeniería en Mantenimiento Industrial) Instituto Tecnológico de Costa Rica, Escuela de Ingeniería en Mantenimiento Industrial, 2016.
This project seeks to determine the structure necessary for the implementation of a
decision making model for maintenance at the Windfarm Los Santos, which has 15
wind turbines G52-850 kW.
It starts with the analysis of work orders between the 29 July 2014 and 13 July 2016.
So the cost and time required for maintenance according to the main systems that
make up the wind turbine unit is analyzed. Of which it was determined that
correspond to critical components: the generator, the gearbox, the hydraulics system
and rotor. Condition variables that can be currently monitored, which could be useful
for the application of the model were selected. Therefore, only it proposes adding
vibration measurements, as although a system of accelerometers in each unit is
installed, by a cost issue of the manufacturer cannot be used it. Accordingly, it is
proposed an alternative of National Instruments for this purpose, which will also allow
startup predictive maintenance plan for the units immediately.
They are analyzed data wind speeds from the years 2013, 2014 and 2015 in order
to display the variability of load on the units over the years. Therefore, it is added the
load node to the topologies for the artificial neural networks proposed, which
corresponds to the power generated in the unit, so as to allow this to consider
changing of it in the model.
Instituto Tecnológico de Costa Rica
Lidia Gómez
Cartago - 300m Este del Estadio Fello Meza. Apartado 159-7050.
2550-2263, 2550-2365