Remodelación de la red de distribución eléctrica de media tensión para el servicio de urgencias del Hospital Dr. Fernando Escalante Pradilla
2016
Instituto Tecnológico de Costa Rica.
The execution of this reshuffle will take place in Escalante Pradilla Hospital
Dr. Fernando Pérez Zeledón. This is done in order to adapt the electrical design of
hospital infrastructure extensions.The system consists of a network of overhead
power distribution and other underground.
The medium voltage network of 34.5 KV hospital requires the installation of
two new transformers for the new burdens that are needed in the Emergency
Service. Installing new building loads Emergency strengthen the system requires
medium voltage equipment demand.
The second part of the project consists of a montage of underground lines
that are within the hospital. This network of underground medium voltage must
reach an internal substation and then derived three transformers to feed pedestal.
For better understanding the needs of the hospital, an analysis of the current
situation of medium voltage system feeding the hospital is done. This allows to
analyze and understand the existing aerial installation that feeds the hospital. The
underground distribution will be installed in its new majority.
Then a layout design and assembly of the posts forming the airlines is
performed. In the same way the calculations are set to pay underground medium
voltage distribution transformers that feed.
The budget that the project requires for its implementation, which
corresponds to US $ 81,000 triphasic. This includes airlines, the air transition,
underground lines.This cost is presented in order to justify the construction of the
work that needs Hospital.
Proyecto de Graduación (Licenciatura en Ingeniería en Mantenimiento Industrial) Instituto Tecnológico de Costa Rica, Escuela de Ingeniería Electromecánica, 2016.
Instituto Tecnológico de Costa Rica