« Volver Ficha del Documento

Herramienta para el Cálculo de Materiales y Costos de Obras de Infraestructura en Proyectos Urbanísticos

2009

As a result of this study was to develop a tool that calculates the amount of materials and labor costs of infrastructure development projects. The application from Excel allows you to generate reports for each item as well as reports of the projects to be undertaken. To develop this project with the criteria for the developer of contractors and other professionals related to the field of construction of such development projects, those who agree, moreover, the importance of obtaining accurate information materials and costs of each of the elements that make up the different activities of these projects. The conclusion of the work done to determine the importance of such a tool for calculating materials and real costs of an infrastructure project planning and the creation of a program to input and process information from the analysis planes, and the different situations that arise in the field.

Instituto Tecnológico de Costa Rica. Escuela de Ingeniería en Construcción; PAYCOSA.

Proyecto de Graduación (Licenciatura en Ingeniería en Construcción). Instituto Tecnológico de Costa Rica. Escuela de Ingeniería en Construcción, 2009.

Instituto Tecnológico de Costa Rica

Lidia Gómez

Cartago - 300m Este del Estadio Fello Meza. Apartado 159-7050.

2550-2263, 2550-2365


Dirección: Av. Mariscal Antonio José de Sucre N58-63 y Fernández Salvador Edif. Olade - San Carlos, Quito - Ecuador.

Web: www.olade.org

Teléfonos: (593 2) 259 8122 / 2598 280

Correo: realc@olade.org

ADMIN
Desarrollado por: Aikyu-Systems