« Volver Ficha del Documento

Sistemas de control de erosión en la subestructura de puentes

2007

Instituto Tecnológico de Costa Rica. Escuela de Ingeniería en Construcción.

Proyecto de Graduación (Licenciatura en Ingeniería en Construcción). Instituto Tecnológico de Costa Rica. Escuela de Ingeniería en Construcción, 2007.

This Project is in the area of river Hydraulics, giving a solution to a particular problem of erosion at the bridge over the Barranca River. It also attempts to raise conscience of the bridge maintenances necessity. The study of the fluvial principles is developed in ten classic examples for Costa Rica bridges, and it is model in HECRAS. Whit the study of the ten particular cases it is established the basic design parameters: design discharge, flow type, geometric section, the roughness, morphologic and hydraulic, determine the length and the height to protect, the revetment type and the granulometry. With these parameters the solution that works better for the bridge at Barranca River is the articulating concrete blocks

Instituto Tecnológico de Costa Rica

Lidia Gómez

Cartago - 300m Este del Estadio Fello Meza. Apartado 159-7050.

2550-2263, 2550-2365


Dirección: Av. Mariscal Antonio José de Sucre N58-63 y Fernández Salvador Edif. Olade - San Carlos, Quito - Ecuador.

Web: www.olade.org

Teléfonos: (593 2) 259 8122 / 2598 280

Correo: realc@olade.org

ADMIN
Desarrollado por: Aikyu-Systems