Buscar en la Biblioteca virtual

Resultado - 2649 Documentos
Mostrando:

Faculty of environmental design : calendar 1997 - 1998

The University of Calgary;

A learning package for MDPs : a quintessential reference for timely and successful completion of the master's degree project

Naylor, B.L.; Stauch, J.;

Electricity supply to rural areas of Argentina

Institute of Energy Economics, IDEE; National University of Misiones, Argentina;

Empresa Nacional de Trasmisión Eléctrica: Consultoría No.14-2011

Nicaragua. Empresa Nacional de Transmisión Eléctrica ;

Descargar documento

Hydrocopalar Nidamerica (Nicaragua). Registro No.098881

República de Nicaragua;

Descargar documento

Estudio de factibilidad de alumbramiento de aguas termales en la zona del ingenio azucarero de CALNU,Colonia España,Departamento de Artigas..

Pacheco, A.; Cicalese, H; Ministerio de Industria Energia y Mineria.Direccion Nacional de Mineria y GeologiaPena, S; Carrion, R.;

Ver informe Calnu pozo termal (299 Kb) "" target="_blank">Descargar documento

Proyecto piedras duras de Uruguay. Estudio de Mercado.

CEU;

Estudio geologico para licitar una concesion para explotar del yacimiento de granito negro en clase II denominado como Mexico.

Ministerio de Industria EnergIa y Mineria, Direccion Nacional de MIneria y Geologia, Montevideo(UY)Pirelli, H.; Medina, E.;

Estudio economico de la posbilidad de explotar el yacimiento de Arenas negras de Aguas Dulces - Departamento de Rocha..

DINAMIGEDINAMIGE;

Inventario Minero del Uruguay - Resultados del Estudio Geoquimico Semitactico 243-01.

Spangenberg, J;

Studies of Projects Included in the Programme for Development of Small Hydroelectric Power Plants, Rio Viejo Lower Reach Seismic Refraction Investigation

Consulting Engineers, Architects and Economist;

Master Plan for Rio Viejo and Feasibility Study for Montegrande Hydropower Project. Consulting Services for Los Calpules Hydropower Project: Progress Report No.2

Norconsult Internatiuonal Norway; Swedpower AB Sweden;

Master Plan for Rio Viejo, Irrigation Study

Norconsult International Norway; Swedpower AB Sweden;

Proyecto Rio Viejo-Master Plan-Irrigation Study: Final Report

Norconsult International Norway; Swedpower AB Sweden;

Proyecto Río Viejo Master-Plan-Volumen I Main Report

Swedpower AB Sweden; Norconsult Internartional Norway;

Master Plan Prefeability Study of Lower Rio Viejo - Final Report

Swedpower AB Sweden; Norconsult International Norway;

Proyecto Rio Viejo-Master Plan Seismological Study-Final Report

Norconsult International Norway; Swedpower AB Sweden;

La Sirena Hydropower Project, Feasibility Studies. Tender Design and Tender Document. Feasibility Report Drillcore and Sample Phothographs

Norconsult International Norway; Swedpower AB Sweden;

Mostrando:
Energizing finance understanding the land scapeVer Ficha
Nationally determinated contributions under de Paris Agreement.Ver Ficha
Nuclear energy for a net zero worldVer Ficha
World energy outlook 2021Ver Ficha
Nationally determined contributions across the Americas. A comparative hemispheric analysis.Ver Ficha
Código de Instalaciones Eléctricas de NicaraguaVer Ficha
Economía ambiental : una introducción.Ver Ficha
Apuntes para un manual técnico de diseño, estandarización y fabricación de equipos para pequeñas centrales hidroeléctricas. Turbinas Michell - BankiVer Ficha
Informe de estadísticas energéticas = Energy statistics report 2012Ver Ficha
Manual estadística energética 2017 = Energy statistics manual 2017Ver Ficha


Dirección: Av. Mariscal Antonio José de Sucre N58-63 y Fernández Salvador Edif. Olade - San Carlos, Quito - Ecuador.

Web: www.olade.org

Teléfonos: (593 2) 259 8122 / 2598 280

Correo: realc@olade.org

ADMIN
Desarrollado por: Aikyu-Systems