Fluidized bed combustion for brazilian coal : Sao Jeronimo plant.
1985
228
CIENA
INTRODUCTORY REMARKS. Terms of Reference. Determination of the Plant Concept. DESCRIPTION OF THE AFBC BOILER PLANT. Design Criteria. Overall Plant Design. Fuel Supply system. Firing Plant. Ash Removal System. Boiler Plant. Control and Instrumentation, Interlocks. TECHNICAL DATA OF THE AFBC BOILER. Boiler Plant Design. Fluidized Bed Desing. Firing Plant. Fuel. Boiler Feedwater and Boiler Water. AUXILIARY PLANT SYSTEMS. Description of Proposed Arrangement. Design Criteria for the Auxiliary Systems. Interconnection of the New Boiler with the Existing Systems. Extension of the Civil Structures. PROPOSAL FOR THE TEST PROGRAMME. Objectives of the Programme. Comments on the Objectives. ESTIMATED COSTS. Price of German Scope of Supply. Price of Brazilian Scope of Supple. Total Price of the AFBC-Power Plant Sao Jeronimo. PROPOSAL FOR THE NEXT PHASE. AFBC Steam Generator(German Working Group). Auxiliary Systems (Brazilian Working Group). Time Schedule and Cost Estimation.
Presenta diagrs.
Ministerio de Ambiente y Energía. Secretaría de Planificación del Sub-Sector Energía - Centro de Información de Energía y Ambiente, CIENA
Grettel Ruiz Matarrita
Calle 25, Avenidas 8 y 10. San José, Costa Rica
(506)25476900 - 25476239
De lunes a viernes de 8 a.m. a 12m.